Terms and Conditions
|
11/15/2018 8:25:00 AM
|
BILCO sales and price quotation terms and conditions
|
Returns
|
9/19/2019 1:13:00 PM
|
Product return policy form
|
W9 Form
|
1/6/2022 12:55:00 PM
|
BILCO taxpayer identification form
|
Damaged Return Policy
|
12/8/2021 3:34:00 PM
|
Instructions for damaged product return
|
Credit Application
|
3/31/2020 12:48:00 PM
|
New customer account credit application form
|
Automatic Smoke Vents
|
6/27/2017 2:03:00 PM
|
Complete warranty information and instructions for product registration.
|
Bilco Residential Products
|
6/23/2020 2:02:00 PM
|
Complete warranty information for Bilco basement doors and emergency egress window wells.
|
Bil-Guard Hatch Rail System
|
6/27/2017 2:04:00 PM
|
Complete warranty information and instructions for product registration.
|
Fall Protection Grating
|
6/27/2017 2:05:00 PM
|
Complete warranty information and instructions for product registration.
|
Floor Vault & Sidewalk Doors
|
6/27/2017 2:05:00 PM
|
Complete warranty information and instructions for product registration (Type J-AL and J-AL H20 only).
|
Floor, Vault & Sidewalk Doors
|
6/27/2017 2:05:00 PM
|
Complete warranty information and instructions for product registration (All models except Type J-AL and J-AL H20).
|
LadderUP Safety Post
|
6/27/2017 2:06:00 PM
|
Complete warranty information and instructions for product registration.
|
Roof Hatch
|
6/27/2017 2:07:00 PM
|
Complete warranty information and instructions for product registration.
|
Automatic Smoke Vent - Double Leaf
|
11/17/2020 10:47:00 AM
|
BIM model for BILCO double leaf fire vents in Revit format. Zipped file includes .rfa file and a .txt type catalog files that allows you do customize your model for your fire venting requirements.
|
Automatic Smoke Vent - Single Leaf
|
11/17/2020 10:48:00 AM
|
BIM model for BILCO single leaf smoke vents in Revit format. Zipped file includes .rfa file and a .txt type catalog files that allows you do customize your model for your fire venting requirements.
|
Fire Rated Floor Door - Single Leaf
|
11/17/2020 10:47:00 AM
|
BIM model for BILCO Type FR Fire Rated Floor door in Revit format. Zipped file includes .rfa files for both open and closed views.
|
Floor Access Door - Double Leaf
|
11/17/2020 10:48:00 AM
|
BIM model for BILCO double leaf floor doors in Revit format. Zipped file includes .rfa file and a .txt type catalog files that allows you do customize your model for your floor door requirements.
|
Floor Access Door - Single Leaf
|
11/17/2020 10:49:00 AM
|
BIM model for BILCO single leaf floor doors in Revit format. Zipped file includes .rfa file and a .txt type catalog files that allows you do customize your model for your floor door requirements.
|
Roof Hatch - Double Leaf
|
11/17/2020 10:50:00 AM
|
BIM model for BILCO double leaf roof hatches in Revit format. Zipped file includes .rfa file and a .txt type catalog files that allows you do customize your model for your roof hatch requirements.
|
Roof Hatch - Single Leaf
|
11/17/2020 10:50:00 AM
|
BIM model for BILCO single leaf roof hatches in Revit format. Zipped file includes .rfa file and a .txt type catalog files that allows you do customize your model for your roof hatch requirements.
|
Type ACDSV
|
10/23/2020 3:06:00 PM
|
Sectional Detail in .dxf CAD File Format
|
Type DSH
|
10/23/2020 3:07:00 PM
|
Sectional Detail in .dxf CAD File Format
|
Type GS-SV
|
12/4/2023 2:48:00 PM
|
Sectional Detail in .dxf CAD File Format
|
Type Lumivent
|
10/23/2020 3:08:00 PM
|
Sectional Detail in .dxf CAD File Format.
|
Type S-SV
|
10/23/2020 3:08:00 PM
|
Sectional Detail in .dxf CAD File Format.
|
Type S-SVEV (elevator vent)
|
10/23/2020 3:09:00 PM
|
Sectional Detail in .dxf CAD File Format.
|
Type FR - with closing mechanism
|
9/23/2020 12:55:00 PM
|
Sectional Detail in .dxf CAD File Format
|
Type FRLC - without closing mechanism
|
9/23/2020 12:55:00 PM
|
Sectional Detail in .dxf CAD File Format
|
Type HLC
|
9/23/2020 12:55:00 PM
|
Sectional Detail in .dxf CAD File Format
|
Type J (single leaf)
|
9/23/2020 12:56:00 PM
|
Sectional Detail in .dxf CAD File Format
|
Type J H20 (single leaf)
|
9/23/2020 1:06:00 PM
|
Sectional Detail in .dxf CAD File Format
|
Type JD-AL (double leaf)
|
9/23/2020 12:59:00 PM
|
Sectional Detail in .dxf CAD File Format
|
Type J-AL H20 (single leaf)
|
9/23/2020 12:58:00 PM
|
Sectional Detail in .dxf CAD File Format
|
Type J-AL-R
|
9/23/2020 12:58:00 PM
|
Sectional Detail in .dxf CAD File Format
|
Type JD (double leaf)
|
9/23/2020 12:58:00 PM
|
Sectional Detail in .dxf CAD File Format
|
Type J-SEC
|
9/23/2020 1:07:00 PM
|
Sectional Detail in .dxf CAD File Format
|
Type K (single leaf)
|
9/23/2020 1:07:00 PM
|
Sectional Detail in .dxf CAD File Format
|
Type KD (double leaf)
|
9/23/2020 1:07:00 PM
|
Sectional Detail in .dxf CAD File Format
|
Type PCM (single leaf)
|
9/23/2020 1:12:00 PM
|
Sectional Detail in .dxf CAD File Format
|
Type PDCM (double leaf)
|
9/23/2020 1:13:00 PM
|
Sectional Detail in .dxf CAD File Format
|
Type Q (single leaf)
|
9/23/2020 1:09:00 PM
|
Sectional Detail in .dxf CAD File Format
|
Type QD (double leaf)
|
9/23/2020 1:10:00 PM
|
Sectional Detail in .dxf CAD File Format
|
Type SM (surface mount)
|
9/23/2020 1:10:00 PM
|
Sectional Detail in .dxf CAD File Format
|
Type T (single leaf)
|
9/23/2020 1:10:00 PM
|
Sectional Detail in .dxf CAD File Format
|
Type TD (double leaf)
|
9/23/2020 1:10:00 PM
|
Sectional Detail in .dxf CAD File Format
|
Type TER (single leaf)
|
9/23/2020 1:11:00 PM
|
Sectional Detail in .dxf CAD File Format
|
Type TRD (double leaf)
|
9/23/2020 1:11:00 PM
|
Sectional Detail in .dxf CAD File Format
|
Classic Series Basement Door
|
2/12/2016 10:47:00 PM
|
Classic Series Basement Door CAD detail in .dxf Format
|
Classic Series Sloped Wall Basement Door
|
2/12/2016 10:49:00 PM
|
Classic Series Sloped Wall Basement Door CAD detail in .dxf Format
|
Ultra Series Basement Door
|
2/12/2016 10:50:00 PM
|
Ultra Series Basement Door CAD detail in .dxf Format
|
Security Series
|
9/24/2020 10:00:00 AM
|
Sectional detail in .dxf CAD file format.
|
Type D
|
9/24/2020 9:55:00 AM
|
Sectional detail in .dxf CAD file format.
|
Type D-50T
|
9/24/2020 9:55:00 AM
|
Sectional detail in .dxf CAD file format.
|
Type E
|
9/24/2020 9:55:00 AM
|
Sectional detail in .dxf CAD file format.
|
Type E-50TB
|
12/4/2023 2:46:00 PM
|
Sectional detail in .dxf CAD file format.
|
Type F
|
9/24/2020 9:56:00 AM
|
Sectional detail in .dxf CAD file format.
|
Type F-50TB
|
10/16/2020 8:34:00 AM
|
Thermally Broken Design. Sectional Detail in .dxf CAD File Format.
|
Type GS
|
9/24/2020 9:57:00 AM
|
Sectional detail in .dxf CAD file format.
|
Type GS-50TB
|
10/16/2020 8:35:00 AM
|
Thermally Broken Design. Sectional Detail in .dxf CAD File Format.
|
Type L
|
9/24/2020 9:57:00 AM
|
Sectional detail in .dxf CAD file format.
|
Type L-50TB
|
9/24/2020 9:58:00 AM
|
Thermally Broken Design. Sectional Detail in .dxf CAD File Format.
|
Type NB
|
5/31/2022 1:44:00 PM
|
Sectional detail in .dxf CAD file format.
|
Type NB-50TB
|
12/4/2023 2:49:00 PM
|
Thermally Broken Design. Sectional Detail in .dxf CAD File Format.
|
Type NB-HZ
|
2/17/2022 3:34:00 PM
|
Miami Dade Approved. Sectional detail in .dxf CAD file format.
|
Type S
|
2/17/2022 3:35:00 PM
|
Miami Dade Approved. Sectional detail in .dxf CAD file format.
|
Type S-50TB
|
12/4/2023 2:49:00 PM
|
Thermally Broken Design. Sectional Detail in .dxf CAD File Format.
|
Type SS
|
9/24/2020 10:00:00 AM
|
Sectional detail in .dxf CAD file format.
|
Type SS-50TB
|
10/16/2020 8:33:00 AM
|
Thermally Broken Design. Sectional Detail in .dxf CAD File Format.
|
VersaMount
|
9/24/2020 10:01:00 AM
|
Sectional detail in .dxf CAD file format.
|
BIL-Guard - D Roof Hatch
|
10/9/2020 10:34:00 AM
|
Sectional detail in .dxf CAD file format.
|
BIL-Guard - DSH Smoke Vent
|
10/9/2020 10:38:00 AM
|
Sectional detail in .dxf CAD file format.
|
BIL-Guard - L Roof Hatch
|
10/9/2020 10:38:00 AM
|
Sectional detail in .dxf CAD file format.
|
BIL-Guard - NB Roof Hatch
|
10/9/2020 10:45:00 AM
|
Sectional detail in .dxf CAD file format.
|
BIL-Guard - SV Smoke Vent
|
10/9/2020 10:39:00 AM
|
Sectional detail in .dxf CAD file format.
|
Ladder-UP Safety Post
|
5/4/2017 12:42:00 PM
|
Sectional detail in .dxf CAD file format.
|
Installation Instructions - Automatic Fire Vent
|
2/13/2016 3:23:00 PM
|
Installation instruction sheet for Bilco automatic fire vents.
|
Installation Instructions - Bil-Clip Flashing System
|
2/13/2016 3:24:00 PM
|
Detail and installation instructions for this standard feature on all Bilco roofing products.
|
Installation Instructions - Bil-Guard 2.0 Hatch Rail System
|
3/19/2018 3:05:00 PM
|
View and print product installation instructions.
|
Installation Instructions - Bil-Guard on a Fully Enclosed Curb
|
11/8/2017 10:08:00 AM
|
View and print product installation instructions for installing railing system on a hatch with a fully enclosed curb.
|
Installation Instructions - LadderUP Safety Post
|
2/13/2016 3:27:00 PM
|
LadderUP Safety Post Installation Instruction instruction sheet.
|
Installation Instructions - Roof Hatch
|
2/13/2016 3:28:00 PM
|
General instructions for installing Bilco Roof Hatches
|
Installation Instructions - Versamount Access Hatch
|
2/13/2016 3:29:00 PM
|
Versamount Installation Instructions
|
Operation & Maintenance - Automatic Smoke Vents
|
2/13/2016 3:30:00 PM
|
Operation and Maintenance Instructions for Bilco single and double leaf Automatic Smoke Vents.
|
Operation & Maintenance - Floor Access Doors
|
2/13/2016 3:31:00 PM
|
Operation and Maintenance Instructions for Bilco single and double leaf Floor Access Doors.
|
Operation & Maintenance - Floor Door Hold Open Arm Replacement
|
2/13/2016 3:31:00 PM
|
View and print product installation instructions for replacing Hold Open Arms
|
Operation & Maintenance - Floor Door Lifting Mechanism Replacement
|
2/13/2016 3:32:00 PM
|
View and print product installation instructions for installing lifting mechanisms with composite tubes.
|
Operation & Maintenance - Floor Door Slam Lock Replacement
|
2/13/2016 3:32:00 PM
|
View and print product installation instructions for replacing a slam lock.
|
Operation & Maintenance - Resetting a Smoke Vent Latch
|
2/13/2016 3:33:00 PM
|
Latch resetting instructions for Bilco double leaf automatic fire vents. Includes instructions on how to replace a fusible link.
|
Operation & Maintenance - Roof Hatch Hinge Replacement
|
2/13/2016 3:34:00 PM
|
View and print product installation instructions for installing and replacing Roof Scuttle hinges
|
Operation & Maintenance - Roof Hatch Lock Replacement
|
2/13/2016 3:34:00 PM
|
View and print product installation instructions for installing and replacing the single point lock and turn handle on a Roof Hatch
|
Operation & Maintenance - Roof Hatches
|
2/13/2016 3:35:00 PM
|
Operation and Maintenance Instructions for Bilco single and double leaf Roof Hatches.
|
Operation & Maintenance - Sidewalk Door Detent Replacement
|
2/13/2016 3:36:00 PM
|
View and print product installation instructions for replacing the hold open arm detent.
|
Classic Series Door - Extension Panels
|
8/7/2019 3:08:00 PM
|
Instructions for installing extension panels on Classic Series Steel Sided Basement Doors.
|
Classic Series Door - Header Replacement
|
8/7/2019 3:09:00 PM
|
Instructions for installing a replacement header on a Classic Series Steel Sided Basement Door.
|
Classic Series Door (gas spring lift assistance)
|
8/5/2022 1:47:00 PM
|
Installation instructions for a Bilco Classic Series Basement Door with gas spring lift assistance. (gas spring lift assistance supplied on doors manufactured after April 2010.)
|
Classic Series Door (torsion rod lift assistance)
|
2/13/2016 3:42:00 PM
|
Installation instructions for a Bilco Classic Series Basement Door with torsion rod lift assistance. (torsion rod lift assistance supplied on doors manufactured before April 2010)
|
Classic Series Doors - Keyed Lock Kit
|
7/31/2019 8:14:00 AM
|
View and print product installation instructions.
|
Classic Series BR Sloped Wall Basement Door
|
11/13/2020 10:21:00 AM
|
View and print product installation instructions.
|
Classic Series BR Sloped Wall Basement Door - Extensions
|
1/28/2020 11:10:00 AM
|
View and print product installation instructions
|
Español - pozo de ventana ScapWEL (Window Well)
|
10/20/2017 8:31:00 AM
|
Instrucciones para el ensamblaje y la instalación.
|
Español - Puerta de sótano (Diseño de Rod de la torsión)
|
2/13/2016 3:47:00 PM
|
Puerta de sótano Bilco instrucciones de instalación.
|
Español - Puerta de sótano (Diseño del resorte de gas)
|
8/5/2022 1:47:00 PM
|
Puerta de sótano Bilco instrucciones de instalación.
|
Español - Puerta de sótano de la serie Ultra (Ultra Series)
|
7/2/2018 10:45:00 AM
|
Puerta de sótano Bilco de la serie Ultra instrucciones de instalación.
|
Español - Puerta de sótano para pared inclinada (Sloped wall door)
|
11/13/2020 10:21:00 AM
|
Puerta de sótano BILCO para pared inclinada instrucciones de instalación.
|
Modifying a Basement Door Areaway
|
2/13/2016 3:59:00 PM
|
Common solutions for installing a door on a non-standard areaway.
|
PermEntry Basement Entrance Job Site Requirements
|
6/9/2017 9:31:00 AM
|
Pre-installation and post-installation requirements for installing a PermEntry Basement Entrance.
|
Planning or Adding an Areaway for a Bilco Basement Door
|
6/8/2017 1:51:00 PM
|
Information on how to add a masonry areaway and the convenience of direct basement access to your home.
|
Powder Coat Basement Door Color Chart
|
8/25/2020 7:44:00 AM
|
Order your basement door with a powder coat finish and eliminate the time and expense of painting the door yourself. Check out our standard colors.
|
ScapeWEL Dome Cover Installation Instructions
|
2/13/2016 4:02:00 PM
|
View and print product installation instructions.
|
ScapeWEL Window Well
|
10/20/2017 8:30:00 AM
|
View and print product installation instructions.
|
ScapeWEL Window Well Deep Well Extension
|
10/23/2017 9:23:00 AM
|
View and print product installation instructions.
|
Stair Stringer Installation Instructions
|
10/20/2017 10:25:00 AM
|
Installation instructions for installing Bilco stair stringers on existing basement door areaways.
|
stakWEL Cover Installation Instructions
|
2/13/2016 4:08:00 PM
|
View and print instructions in PDF format.
|
stakWEL Modular Window Well System
|
6/12/2017 10:10:00 AM
|
View and print product installation instructions.
|
Ultra Series Basement Doors
|
10/23/2017 11:58:00 AM
|
View and print product installation instructions.
|
Ultra Series Basement Doors - Extensions
|
7/2/2018 10:46:00 AM
|
View and print product installation instructions.
|
Ultra Series Door - Damper Replacement
|
2/13/2016 4:13:00 PM
|
Instructions on how to replace the dampers on an Ultra Series Basement Door.
|
Flyer: Bil-Guard 2.0
|
12/4/2023 1:55:00 PM
|
The Bil-Guard 2.0 hatch railing system meets OSHA requirements for fall protection around roof hatch openings.
|
Catalog: Commercial Products
|
6/11/2020 7:35:00 AM
|
Full color 40-page catalog includes complete information on the company’s line of roof hatches, automatic fire vents, and floor, vault and sidewalk doors.
|
Flyer: Lumivent
|
11/17/2017 1:51:00 PM
|
The Lumivent provides automatic smoke vent protection while providing natural daylighting for reduced energy costs.
|
Flyer: Tnemec Paint
|
11/17/2017 1:42:00 PM
|
Color chart for Tnemec paint finish available on all BILCO commercial products.
|
Brochure: Precast Vault Door
|
11/17/2017 1:29:00 PM
|
Four-page, color brochure provides complete information on BILCO's Type PCM precast vault access door. The product is designed with features that make it easier to install in precast concrete vaults.
|
Brochure: Roofing Products
|
12/4/2023 11:08:00 AM
|
20-page brochure provides an overview of the roof hatch, automatic smoke vent, and hatch safety products available from The BILCO Company.
|
Brochure: Safety Products
|
11/17/2017 1:28:00 PM
|
Full color brochure includes product features, benefits, details, and standard sizes for BILCO's Bil-Guard 2.0 Hatch Railing System and LadderUP Safety Post.
|
Flyer: Surface Mount Door
|
11/17/2017 1:37:00 PM
|
The BILCO Type SM floor access door is designed with features that allow it to be easily installed on the surface of a masonry opening.
|
Flyer: Fire Rated Doors
|
11/17/2017 1:44:00 PM
|
Technical Bulletin explaining the differences between fire codes ASTM E152 and ASTM E119 as they relate to fire rated floor doors.
|
Flyer: Terrazzo Doors
|
11/17/2017 1:46:00 PM
|
Order form for BILCO Type TER and TRD doors. Doors are counterbalanced according to the weight of the cover. Use this form to specify the fill material for your door to ensure proper operation.
|
Brochure: PermEntry
|
2/10/2020 12:48:00 PM
|
PermEntry brochure provides complete details and sizing information for this precast basement entrance system. Product includes a precast stairwell and BILCO basement door that is delivered and installed on your home.
|
Flyer: Powder Coat Finish
|
12/4/2023 1:57:00 PM
|
BILCO Classic Series basement doors are available in a powder coat paint finish. This durable finish looks better, lasts longer, and eliminates the need to finish the door after installation.
|
Catalog: Residential Products
|
8/21/2024 7:48:00 AM
|
Catalog contains complete information on BILCO's line of residential access products.
|
Flyer: StakWEL
|
12/4/2023 1:57:00 PM
|
The StakWEL window well system is the fastest and easiest way to add code compliant emergency egress to any basement. Simply stack modules to accommodate your foundation height.
|
Ultra Series Basement Door Flyer
|
10/22/2021 9:07:00 AM
|
Color flyer with product features, specifications and standard sizes.
|
Automatic Smoke Vent Size Chart
|
1/27/2020 10:12:00 AM
|
Standard sizes and weights for Bilco's complete line of Automatic Smoke Vents.
|
Floor Door Size Chart - Drainage Doors
|
11/16/2020 8:03:00 AM
|
Standard sizes and weights for Bilco's complete line of drainage style Floor, Vault & Sidewalk Doors.
|
Floor Door Size Chart - Non-drainage Doors
|
11/19/2018 12:30:00 PM
|
Standard sizes and weights for Bilco's complete line of non-drainage style Floor, Vault & Sidewalk Doors.
|
Roof Hatch Size Chart
|
11/19/2018 12:30:00 PM
|
Standard sizes and weights for Bilco's complete line of Roof Scuttles.
|
Basement Door Standard Sizes and Dimensions
|
1/22/2020 3:37:00 PM
|
Standard model numbers and dimensions for BILCO steel sided and sloped wall basement doors.
|
PermEntry Standard Sizes and Dimensions
|
2/13/2016 6:05:00 PM
|
Information on how to select the proper PermEntry size for your foundation.
|
ScapeWEL Window Well Sizing Guide
|
6/9/2017 12:13:00 PM
|
Guide will help you select the proper size ScapeWEL egress window well based on site conditions and window requirements.
|
StakWEL Window Well Sizing Guide
|
6/9/2017 12:11:00 PM
|
Guide will help you select the proper size StakWEL egress window well based on site conditions and window requirements.
|
Ultra Series Basement Door Sizes and Dimensions
|
6/9/2017 8:52:00 AM
|
Standard model numbers and dimensions for Bilco Ultra Series Maintenance-free Basement Doors.
|
Type ACDSV
|
1/22/2020 10:37:00 AM
|
3-Part product specification in .doc format.
|
Type DSH
|
2/4/2021 9:49:00 AM
|
3-Part product specification in .doc format.
|
Type Lumivent
|
10/4/2019 9:41:00 AM
|
3-Part product specification in .doc format.
|
Type S-SV
|
4/9/2020 2:51:00 PM
|
3-Part product specification in .doc format.
|
Type S-SVEV (elevator shaft)
|
4/9/2020 2:52:00 PM
|
3-Part product specification in .doc format.
|
Type FR
|
4/9/2020 12:46:00 PM
|
3-Part product specification in .doc format.
|
Type HLC
|
1/12/2022 10:14:00 AM
|
3-Part product specification in .doc format.
|
Type J (single leaf)
|
1/12/2022 10:14:00 AM
|
3-Part product specification in .doc format.
|
Type J H20 (single leaf)
|
1/12/2022 10:15:00 AM
|
3-Part product specification in .doc format.
|
Type J-AL (single leaf)
|
4/25/2019 1:53:00 PM
|
3-Part product specification in .doc format.
|
Type J-AL H20 (single leaf)
|
4/25/2019 1:59:00 PM
|
3-Part product specification in .doc format.
|
Type JD (double leaf)
|
1/12/2022 10:15:00 AM
|
3-Part product specification in .doc format.
|
Type JD H20 (double leaf)
|
1/12/2022 10:16:00 AM
|
3-Part product specification in .doc format.
|
Type JD-AL (double leaf)
|
4/25/2019 1:59:00 PM
|
3-Part product specification in .doc format.
|
Type JD-AL H20 (double leaf)
|
4/25/2019 2:00:00 PM
|
3-Part product specification in .doc format.
|
Type K (single leaf)
|
4/25/2019 2:01:00 PM
|
3-Part product specification in .doc format.
|
Type KD (double leaf)
|
4/25/2019 2:01:00 PM
|
3-Part product specification in .doc format.
|
Type PCM - Precast Vault Door
|
4/25/2019 2:04:00 PM
|
3-Part product specification in .doc format.
|
Type Q
|
4/25/2019 2:04:00 PM
|
3-Part product specification in .doc format.
|
Type SM (Surface Mount)
|
4/25/2019 2:06:00 PM
|
3-Part product specification in .doc format.
|
Type T (single leaf)
|
4/25/2019 2:07:00 PM
|
3-Part product specification in .doc format.
|
Type TD (double leaf)
|
4/25/2019 2:08:00 PM
|
3-Part product specification in .doc format.
|
Type TER (single leaf)
|
4/9/2020 2:53:00 PM
|
3-Part product specification in .doc format.
|
Type TRD (double leaf)
|
4/9/2020 2:53:00 PM
|
3-Part product specification in .doc format.
|
Type D - Double Leaf (Special Size)
|
4/9/2020 12:42:00 PM
|
3-Part product specification in .doc format.
|
Type D-50T - Double Leaf (Special Size)
|
4/9/2020 12:42:00 PM
|
Enhanced Performance roof hatch 3-Part product specification in .doc format.
|
Type E - 36x36
|
4/9/2020 12:43:00 PM
|
3-Part product specification in .doc format.
|
Type E-50TB - 36x36
|
4/9/2020 12:44:00 PM
|
Thermally Broken Roof Hatch 3-Part product specification in .doc format.
|
Type F - 48x48
|
4/9/2020 12:45:00 PM
|
3-Part product specification in .doc format.
|
Type F-50TB - 48x48
|
4/9/2020 12:46:00 PM
|
Thermally Broken Roof Hatch 3-Part product specification in .doc format.
|
Type GS - 36x30
|
4/9/2020 12:47:00 PM
|
3-Part product specification in .doc format.
|
Type L - 30x96
|
4/9/2020 2:46:00 PM
|
3-Part product specification in .doc format.
|
Type L-50TB - 30x96
|
4/9/2020 2:47:00 PM
|
Thermally Broken Roof Hatch 3-Part product specification in .doc format.
|
Type NB - 30x54
|
4/9/2020 2:47:00 PM
|
3-Part product specification in .doc format.
|
Type NB-50TB - 30x54
|
4/9/2020 2:48:00 PM
|
Thermally Broken Roof Hatch 3-Part product specification in .doc format.
|
Type NB-HZ
|
5/19/2021 10:49:00 AM
|
Miami-Dade Approved. 3-Part product specification in .doc format.
|
Type S - 36x30
|
4/9/2020 2:49:00 PM
|
Miami-Dade Approved. 3-Part product specification in .doc format.
|
Type S-50TB - 36x30
|
4/9/2020 2:50:00 PM
|
Thermally Broken Roof Hatch 3-Part product specification in .doc format.
|
Type SEC - Security Series
|
4/25/2019 2:06:00 PM
|
3-Part product specification in .doc format.
|
Type SS - Single Leaf (Special Size)
|
4/9/2020 2:50:00 PM
|
3-Part product specification in .doc format.
|
Type SS-50-TB - Single Leaf (Special Size)
|
4/9/2020 2:51:00 PM
|
Thermally Broken Roof Hatch 3-Part product specification in .doc format.
|
VersaMount
|
4/9/2020 2:54:00 PM
|
3-Part product specification in .doc format.
|
Bil-Guard Hatch Rail System
|
4/25/2019 1:52:00 PM
|
3-Part product specification in .doc format.
|
Fall Protection Grating
|
4/25/2019 1:56:00 PM
|
3-Part product specification in .doc format.
|
LadderUP Safety Post
|
4/25/2019 2:02:00 PM
|
3-Part product specification in .doc format.
|
Thermolatch Options - Double Leaf Models
|
10/9/2020 2:05:00 PM
|
Submittal drawing in .pdf file format. Drawing provides information on standard Thermolatch II and three electrical operators.
|
Thermolatch Options - Single Leaf Models
|
10/9/2020 2:11:00 PM
|
Submittal drawing in .pdf file format. Drawing provides information on standard Thermolatch II and three electrical operators.
|
Type ACDSV
|
8/2/2024 8:45:00 AM
|
Submittal drawing in .pdf file format.
|
Type DSH
|
10/9/2020 2:05:00 PM
|
Submittal drawing in .pdf file format.
|
Type GS-SV
|
12/4/2023 3:31:00 PM
|
Submittal drawing in .pdf file format.
|
Type Lumivent
|
12/4/2023 3:48:00 PM
|
Submittal drawing in .pdf file format.
|
Type S-SV
|
10/28/2024 10:12:00 AM
|
Submittal drawing in .pdf file format.
|
Type S-SVEV (elevator shaft)
|
10/28/2024 10:13:00 AM
|
Submittal drawing in .pdf file format.
|
Type FR - with closing mechanism
|
12/4/2023 3:27:00 PM
|
Submittal drawing in .pdf file format. Drawing includes fully dimensioned product plan and sectional views.
|
Type FRLC - without closing mechanism
|
12/4/2023 3:29:00 PM
|
Submittal drawing in .pdf file format. Drawing includes fully dimensioned product plan and sectional views.
|
Type J (single leaf)
|
12/4/2023 3:33:00 PM
|
Submittal drawing in .pdf file format. Drawing includes fully dimensioned product plan and sectional views.
|
Type J H20 (single leaf)
|
12/4/2023 3:33:00 PM
|
Submittal drawing in .pdf file format. Drawing includes fully dimensioned product plan and sectional views.
|
Type J-AL (single leaf)
|
12/4/2023 3:34:00 PM
|
Submittal drawing in .pdf file format. Drawing includes fully dimensioned product plan and sectional views.
|
Type J-AL H20 (single leaf)
|
12/4/2023 3:39:00 PM
|
Submittal drawing in .pdf file format. Drawing includes fully dimensioned product plan and sectional views.
|
Type J-AL-R
|
12/4/2023 3:40:00 PM
|
Submittal drawing in .pdf file format. Drawing includes fully dimensioned product plan and sectional views.
|
Type JD (double leaf)
|
12/4/2023 3:42:00 PM
|
Submittal drawing in .pdf file format. Drawing includes fully dimensioned product plan and sectional views.
|
Type JD H20 (double leaf)
|
12/4/2023 3:41:00 PM
|
Submittal drawing in .pdf file format. Drawing includes fully dimensioned product plan and sectional views.
|
Type JD-AL (double leaf)
|
12/4/2023 3:43:00 PM
|
Submittal drawing in .pdf file format. Drawing includes fully dimensioned product plan and sectional views.
|
Type JD-AL H20 (double leaf)
|
12/4/2023 3:41:00 PM
|
Submittal drawing in .pdf file format. Drawing includes fully dimensioned product plan and sectional views.
|
Type J-SEC
|
12/4/2023 3:44:00 PM
|
Submittal drawing in .pdf file format. Drawing includes fully dimensioned product plan and sectional views.
|
Type K (single leaf)
|
12/4/2023 3:44:00 PM
|
Submittal drawing in .pdf file format. Drawing includes fully dimensioned product plan and sectional views.
|
Type KD (double leaf)
|
12/4/2023 3:45:00 PM
|
Submittal drawing in .pdf file format. Drawing includes fully dimensioned product plan and sectional views.
|
Type PCM (single leaf)
|
12/4/2023 3:54:00 PM
|
Submittal drawing in .pdf file format. Drawing includes fully dimensioned product plan and sectional views.
|
Type PDCM (double leaf)
|
12/4/2023 3:54:00 PM
|
Submittal drawing in .pdf file format. Drawing includes fully dimensioned product plan and sectional views.
|
Type Q (single leaf)
|
12/4/2023 3:55:00 PM
|
Submittal drawing in .pdf file format. Drawing includes fully dimensioned product plan and sectional views.
|
Type QD (double leaf)
|
12/4/2023 3:56:00 PM
|
Submittal drawing in .pdf file format. Drawing includes fully dimensioned product plan and sectional views.
|
Type SM (surface mount)
|
12/4/2023 4:05:00 PM
|
Submittal drawing in .pdf file format. Drawing includes fully dimensioned product plan and sectional views.
|
Type T (single leaf)
|
12/4/2023 4:12:00 PM
|
Submittal drawing in .pdf file format. Drawing includes fully dimensioned product plan and sectional views.
|
Type TD (double leaf)
|
12/4/2023 4:13:00 PM
|
Submittal drawing in .pdf file format. Drawing includes fully dimensioned product plan and sectional views.
|
Type TER (single leaf)
|
12/4/2023 4:13:00 PM
|
Submittal drawing in .pdf file format. Drawing includes fully dimensioned product plan and sectional views.
|
Type TRD (double leaf)
|
12/4/2023 4:14:00 PM
|
Submittal drawing in .pdf file format. Drawing includes fully dimensioned product plan and sectional views.
|
Security Series
|
12/4/2023 4:04:00 PM
|
Submittal drawing in .pdf file format. Drawing includes fully dimensioned product plan and sectional views.
|
Type D
|
12/4/2023 3:20:00 PM
|
Submittal drawing in .pdf file format. Drawing includes fully dimensioned product plan and sectional views.
|
Type D-50T
|
12/4/2023 3:21:00 PM
|
Submittal drawing in .pdf file format. Drawing includes fully dimensioned product plan and sectional views.
|
Type E
|
12/4/2023 3:22:00 PM
|
Submittal drawing in .pdf file format. Drawing includes fully dimensioned product plan and sectional views.
|
Type E-50TB
|
12/4/2023 3:23:00 PM
|
Submittal drawing in .pdf file format. Drawing includes fully dimensioned product plan and sectional views.
|
Type F
|
12/4/2023 3:24:00 PM
|
Submittal drawing in .pdf file format. Drawing includes fully dimensioned product plan and sectional views.
|
Type F-50TB
|
12/4/2023 3:25:00 PM
|
Submittal drawing in .pdf file format. Drawing includes fully dimensioned product plan and sectional views.
|
Type GS
|
12/4/2023 3:29:00 PM
|
Submittal drawing in .pdf file format. Drawing includes fully dimensioned product plan and sectional views.
|
Type GS-50TB
|
12/4/2023 3:30:00 PM
|
Thermally Broken Design. Submittal drawing in .pdf file format. Drawing includes fully dimensioned product plan and sectional views..
|
Type L
|
12/4/2023 3:46:00 PM
|
Submittal drawing in .pdf file format. Drawing includes fully dimensioned product plan and sectional views.
|
Type L-50TB
|
10/16/2020 8:35:00 AM
|
Thermally Broken Design. Submittal drawing in .pdf file format. Drawing includes fully dimensioned product plan and sectional views.
|
Type NB
|
12/4/2023 3:51:00 PM
|
Submittal drawing in .pdf file format. Drawing includes fully dimensioned product plan and sectional views.
|
Type NB-50TB
|
12/4/2023 3:52:00 PM
|
Thermally Broken Design. Submittal drawing in .pdf file format. Drawing includes fully dimensioned product plan and sectional views.
|
Type NB-HZ
|
10/11/2024 7:51:00 AM
|
Miami-Dade Approved. Submittal drawing in .pdf file format. Drawing includes fully dimensioned product plan and sectional views.
|
Type S
|
10/11/2024 7:52:00 AM
|
Miami-Dade Approved. Submittal drawing in .pdf file format. Drawing includes fully dimensioned product plan and sectional views.
|
Type S-50TB
|
12/4/2023 4:01:00 PM
|
Thermally Broken Design. Submittal drawing in .pdf file format. Drawing includes fully dimensioned product plan and sectional views.
|
Type SS
|
12/4/2023 4:07:00 PM
|
Submittal drawing in .pdf file format. Drawing includes fully dimensioned product plan and sectional views.
|
Type SS (Optional handrail - 56 degree)
|
12/4/2023 4:06:00 PM
|
Submittal drawing in .pdf file format. Drawing includes fully dimensioned product plan and sectional views.
|
Type SS (Optional handrail - 68 degree)
|
12/4/2023 4:06:00 PM
|
Submittal drawing in .pdf file format. Drawing includes fully dimensioned product plan and sectional views.
|
Type SS-50TB
|
12/4/2023 4:10:00 PM
|
Thermally Broken Design. Submittal drawing in .pdf file format. Drawing includes fully dimensioned product plan and sectional views.
|
Versamount
|
12/4/2023 4:15:00 PM
|
Submittal drawing in .pdf file format. Drawing includes fully dimensioned product plan and sectional views.
|
BIL-Guard - Type D Roof Hatch
|
12/4/2023 3:08:00 PM
|
Submittal drawing in .pdf file format. Drawing includes fully dimensioned product plan and sectional views.
|
BIL-Guard - Type DSH Fire Vent
|
12/4/2023 3:08:00 PM
|
Submittal drawing in .pdf file format. Drawing includes fully dimensioned product plan and sectional views.
|
BIL-Guard - Type L Roof Hatch
|
12/4/2023 3:12:00 PM
|
Submittal drawing in .pdf file format. Drawing includes fully dimensioned product plan and sectional views.
|
BIL-Guard - Type NB Roof Hatch
|
12/4/2023 3:15:00 PM
|
Submittal drawing in .pdf file format. Drawing includes fully dimensioned product plan and sectional views.
|
BIL-Guard - Type SV Fire Vent
|
12/4/2023 3:18:00 PM
|
Submittal drawing in .pdf file format. Drawing includes fully dimensioned product plan and sectional views.
|
LadderUP Safety Post
|
12/4/2023 3:47:00 PM
|
Submittal drawing in .pdf file format. Drawing includes fully dimensioned product plan and sectional views.
|
Commercial Product Images
|
2/8/2017 1:54:00 PM
|
High Resolution Images of Bilco Commerical Products
|
Residential Product Images
|
2/8/2017 2:36:00 PM
|
High Resolution Residential Product Images
|
Automatic Smoke Vent - Security Burglar Bars
|
6/8/2017 1:37:00 PM
|
Detail of factory installed burglar bars on a BILCO automatic smoke vent.
|
Basement Door Painting Instructions
|
8/7/2019 3:07:00 PM
|
Complete instructions for painting BILCO prime painted steel Classic Series basement doors.
|
Classic Series Basement Doors
|
6/9/2017 8:20:00 AM
|
Specifications for BILCO Classic Series steel basement door with a primer finish.
|
Classic Series Sloped Wall Basement Doors
|
6/9/2017 8:21:00 AM
|
Specifications for BILCO Classic Series SLW steel basement door with a primer finish.
|
Ultra Series Basement Doors
|
7/17/2018 7:55:00 AM
|
Specifications for BILCO Ultra Series high-density polyethylene basement doors.
|
PermEntry Basement Entrance
|
6/9/2017 8:58:00 AM
|
Specifications for the PermEntry Basement Entrance System.
|
Frequently Asked Window Well Questions
|
6/9/2017 12:15:00 PM
|
Answers to frequently asked window well questions to aid with your product selection and installation.
|
Tyman PLC / AmesburyTruth™ Acquires BILCO®
|
7/27/2017 2:30:00 PM
|
Released June 16, 2016
|
New Thermally Broken Roof Hatch Introduced
|
7/27/2017 2:46:00 PM
|
Released January 29, 2015
|
Brochure: Barracuda
|
12/4/2023 1:56:00 PM
|
Brochure contains complete information on all the Barracuda Intruder Defense System. Products are designed to barricade or lock down vertical doors in an emergency situation.
|
Barracuda Intruder Defense System
|
9/27/2017 8:47:00 AM
|
Complete warranty information and instructions for product registration.
|
Flyer: Thermally Broken
|
12/4/2023 1:56:00 PM
|
BILCO thermally Broken Roof Hatches feature R-20+ and a patented thermally broken design that reduces heat transfer to prevent harmful condensation.
|
Type GS-50TB - 36x30
|
4/9/2020 12:48:00 PM
|
Thermally Broken Roof Hatch 3-Part product specification in .doc format.
|
IRC 2000 International Residential Building Code
|
8/21/2017 10:01:00 AM
|
Section R310 – Emergency escape and rescue openings
|
IRC 2003 International Residential Building Code
|
8/21/2017 10:02:00 AM
|
Section R310 – Emergency escape and rescue openings
|
IRC 2006 International Residential Building Code
|
8/21/2017 10:03:00 AM
|
Section R310 – Emergency escape and rescue openings
|
IRC 2009 International Residential Building Code
|
8/21/2017 10:04:00 AM
|
Section R310 – Emergency escape and rescue openings
|
IRC 2012 International Residential Building Code
|
8/21/2017 10:04:00 AM
|
Section R310 – Emergency escape and rescue openings
|
IRC 2015 International Residential Building Code
|
8/21/2017 10:05:00 AM
|
Section R310 – Emergency escape and rescue openings
|
Fall Fix-Up Savings Event!
|
8/23/2017 3:15:00 PM
|
Get your basement ready for the winter with a new BILCO basement door. The weather-tight construction will help keep your basement warm and dry over the winter months.Purchase a BILCO basement door at a home center or from one of our dealers between 8/24 - 9/24/17 and receive $75 back from BILCO.
|
BIL-Guard - Type E Roof Hatch
|
12/4/2023 3:09:00 PM
|
Submittal drawing in .pdf file format. Drawing includes fully dimensioned product plan and sectional views.
|
BIL-Guard - Type E-TB Thermally Broken Roof Hatch
|
12/4/2023 3:10:00 PM
|
Submittal drawing in .pdf file format. Drawing includes fully dimensioned product plan and sectional views.
|
BIL-Guard - Type F Roof Hatch
|
12/4/2023 3:10:00 PM
|
Submittal drawing in .pdf file format. Drawing includes fully dimensioned product plan and sectional views.
|
BIL-Guard - Type F-TB Thermally Broken Roof Hatch
|
12/4/2023 3:11:00 PM
|
Submittal drawing in .pdf file format. Drawing includes fully dimensioned product plan and sectional views.
|
BIL-Guard - Type L-TB Thermally Broken Roof Hatch
|
12/4/2023 3:13:00 PM
|
Submittal drawing in .pdf file format. Drawing includes fully dimensioned product plan and sectional views.
|
BIL-Guard - Type NB-TB Thermally Broken Roof Hatch
|
12/4/2023 3:15:00 PM
|
Submittal drawing in .pdf file format. Drawing includes fully dimensioned product plan and sectional views.
|
BIL-Guard - Type S Roof Hatch
|
12/4/2023 3:17:00 PM
|
Submittal drawing in .pdf file format. Drawing includes fully dimensioned product plan and sectional views.
|
BIL-Guard - Type SS Special Size Roof Hatch
|
12/4/2023 3:18:00 PM
|
Submittal drawing in .pdf file format. Drawing includes fully dimensioned product plan and sectional views.
|
BIL-Guard - Type S-TB Thermally Broken Roof Hatch
|
12/4/2023 3:17:00 PM
|
Submittal drawing in .pdf file format. Drawing includes fully dimensioned product plan and sectional views.
|
Type J-AL (single leaf)
|
9/23/2020 12:57:00 PM
|
Sectional Detail in .dxf CAD File Format
|
Type JD-AL H20 (double leaf)
|
9/23/2020 1:00:00 PM
|
Sectional Detail in .dxf CAD File Format
|
Type JD H20 (double leaf)
|
9/23/2020 1:01:00 PM
|
Sectional Detail in .dxf CAD File Format
|
Installation Instructions - Barracuda Door Locking Mechanism
|
8/1/2018 9:51:00 AM
|
Installation instructions for Barracuda model DSI, DSO, DSO-PB, and DCS, vertical emergency locking mechanism.
|
Catalogue en Français pour le Canada
|
9/15/2020 7:44:00 AM
|
Les catalogues contiennent des photos, des détails en coupe, des spécifications ainsi que les tailles et poids standard des produits d’accès BILCO.
|
Catálogo en Español para Latino América
|
9/15/2020 1:09:00 PM
|
Los catálogos contienen fotos, vistas en corte, especificaciones y tamaños y pesos estándar de los productos de acceso
|
Buchanan Park Housing Complex
|
7/26/2019 7:57:00 AM
|
The historic buildings, monuments and scenery around Washington D.C. draw tourists from all over the world. Tenants of 32 new townhomes in the city’s swanky Capitol Hill will have a unique and private vantage point to the area with individual roof hatches, offering them a perspective that is available to only a few residents of the nation’s capital.
|
Los Angeles Metro System
|
7/26/2019 7:57:00 AM
|
The 8.5-mile Crenshaw/LAX Transit Project rail line includes six emergency exit hatches and four large doors to access underground control systems. The hatches and doors, manufactured by The BILCO Company, provide code-compliant egress for underground workers, and eventually, subway riders.
|
Cincinnati Music Hall
|
7/26/2019 8:01:00 AM
|
A Cincinnati landmark with a rich and unique history recently received a total face lift, restoring the facility to the grandeur it displayed when it opened 140 years ago. The project included the installation of BILCO automatic smoke vents to ensure the safety of the structure and building occupants.
|
Hale Centre Theatre
|
7/26/2019 8:03:00 AM
|
The Hale Centre Theatre provides seating capacity for 1,360 patrons and includes two theaters and 130,000 square feet. Constructed in 2017, this $80 million structure is one of the most technologically advanced venues in the world. Acoustical smoke vents, manufactured by BILCO, were included in the design for life safety and to enhance the theater experience. These products limit outside noise intrusion which was a key due to the locations proximity to the freeway and nearby airport.
|
Operation & Maintenance - Fire Rated Floor Access Doors
|
12/10/2018 7:43:00 AM
|
Operation and Maintenance Instructions for BILCO Fire Rated Floor Access Doors.
|
Parliament Hill
|
7/26/2019 8:03:00 AM
|
The renovation of Parliament Hill’s West Block was an $863 million project that finally wrapped up in fall 2018, uniting the charm of a Victorian Gothic structure that was completed in 1865 with the technological advancements of 21st-century construction.
|
Grand Rapids Biodigester Facility
|
7/26/2019 8:02:00 AM
|
In 2018, Grand Rapids, MI began building a $57 million biodigester that will convert food waste to energy and increase energy efficiency. The project, which is expected to be complete in fall 2019, is part of the city’s solution to use 100 percent renewable energy to power city buildings by 2025.
|
Hampton Roads Sanitation District (SWIFT Project)
|
7/26/2019 8:03:00 AM
|
A community in Virginia recently celebrated the opening of an innovative project that could solve a multitude of water-related issues that are affecting the quality of life of local residents. A central part of the system are specialty access doors that stand before pumps and vaults that serve as the engine behind the complex system.
|
University of Texas
|
7/26/2019 8:04:00 AM
|
Ellsworth Kelly developed a clear vision for the final piece of his career as an internationally-acclaimed artist. In the building he designed, Austin, Kelly wanted to bend light in different ways through an array of 33 colored windows, 14 black and white marble panels and an 18-foot tall totem, one of Kelly’s common sculptural forms.
|
White Oak Medical Center
|
7/26/2019 8:04:00 AM
|
An integral part of the $400 million facility is a central utility plant to house mechanical components. Atop the plant are four very large custom roof hatches that will be used to install and access large generators.
|
DICK Cold Storage
|
7/26/2019 7:59:00 AM
|
A ferocious fire in August 2016 destroyed the Columbus, Ohio facility of Dick Cold Storage, which had served the region for nearly 100 years. More than 400 firefighters tackled the blaze at the 144,000-square-foot warehouse, and their task was complicated by the facilities’ products and lack of smoke vents.
|
Great Lakes Center for the Arts
|
7/26/2019 8:02:00 AM
|
When the Great Lakes Center for the Arts opened last year in Michigan, the $25 million facility featured state-of-the-art equipment, including digital sound technology that is found in only a few theaters across the country.
|
Lake Mead Low Lake Level Pumping Station
|
9/18/2019 12:35:00 PM
|
Situated just miles from Hoover Dam, the $650 million project spearheaded by the Southern Nevada Water Authority is one of the most sophisticated and powerful pumping stations in the world. Twelve heavy-duty floor doors manufactured by The BILCO Company are included in the project.
|
McCain Auditorium at Kansas State University
|
10/9/2019 10:55:00 AM
|
On the surface, the task of replacing six smoke vents atop McCain Auditorium at Kansas State University seemed like a routine project. There were several challenges, however, that required some unique problem-solving skills for the contractors that tackled the project.
|
Edward Hines Jr. Veterans Administration Hospital
|
12/6/2019 9:32:00 AM
|
Floor access doors and LadderUP® safety posts from The BILCO Company were included in the construction of an elaborate central utility plant at the Edward Hines Jr. Veterans Administration Hospital near Chicago.
|
Middlesex School
|
2/10/2020 3:46:00 PM
|
A Massachusetts school confronted a difficult space concern with a complete renovation of the campus theater. Architects prepared a plan that completely re-imagined the space and incorporated automatic smoke vents from The BILCO Company to provide an important layer of life and property protection.
|
Pinellas County Pumping Station - Seminole, Florida
|
4/8/2020 9:48:00 AM
|
Over time, the corrosive nature of wastewater took its toll on a pumping station in Seminole, Florida. Moisture and contaminants create highly corrosive conditions that attack metal and concrete structures, causing deterioration. Conditions are worse when the building is located in a humid, coastal environment, such as Seminole.
|
Erger’s Pond Augmentation Station
|
5/11/2020 10:00:00 AM
|
With a surge in population and only about 15 inches of rainfall each year, the city of Brighton, Colorado faces a difficult challenge in water management for its more than 41,000 residents.
|
Little Havana Housing Project
|
6/2/2020 10:49:00 AM
|
Frey’s real estate development company, Tecela, completed a new infll build project last year in the Little Havana section of Miami. Working with architect Jason Chandler and general contractor 748 Development, teams constructed four three-story townhouses, each with four apartments.
|
New Brunswick Performing Arts Center
|
10/20/2020 2:10:00 PM
|
A project that combines the best of entertainment and residential living adds a show-stopping structure to the community in New Brunswick, N.J.
|
BIL-Guard - E Roof Hatch
|
10/9/2020 10:37:00 AM
|
Sectional detail in .dxf CAD file format.
|
BIL-Guard - E-TB Roof Hatch
|
10/9/2020 10:42:00 AM
|
Sectional detail in .dxf CAD file format.
|
BIL-Guard - F Roof Hatch
|
10/9/2020 10:43:00 AM
|
Sectional detail in .dxf CAD file format.
|
BIL-Guard - F-TB Roof Hatch
|
10/9/2020 10:44:00 AM
|
Sectional detail in .dxf CAD file format.
|
BIL-Guard - L-TB Roof Hatch
|
10/9/2020 10:44:00 AM
|
Sectional detail in .dxf CAD file format.
|
BIL-Guard - NB-TB Roof Hatch
|
10/9/2020 10:46:00 AM
|
Sectional detail in .dxf CAD file format.
|
BIL-Guard - S Roof Hatch
|
10/9/2020 10:47:00 AM
|
Sectional detail in .dxf CAD file format.
|
BIL-Guard - S-TB Roof Hatch
|
10/9/2020 10:47:00 AM
|
Sectional detail in .dxf CAD file format.
|
Type HLC
|
12/4/2023 3:32:00 PM
|
Submittal drawing in .pdf file format. Drawing includes fully dimensioned product plan and sectional views.
|
McKinney National Business Park
|
10/29/2020 10:14:00 AM
|
A recently developed business park will give McKinney newbies a place to go for work. McKinney National Business Park will open in multiple phases, accommodating more than 1 million square feet of industrial space.
|
Floor Door Size Chart - Fire Rated
|
11/16/2020 9:54:00 AM
|
Standard sizes and weights for Bilco's complete line of Fire Rated Floor, Vault & Sidewalk Doors.
|
Crossrail Rail Line - London, England
|
11/25/2020 10:44:00 AM
|
Crossrail will transform travel in the United Kingdom with more than 73 miles of an underground railway line cutting through the megalopolis. The line will offcially be branded the Elizabeth line, and will run up to 24 trains per hour in each direction.
|
Waterford Water Treatment Plants - Waterford, CT
|
11/30/2020 3:14:00 PM
|
A project in Waterford, Connecticut demonstrated the town’s commitment to the safety of its employees. Nine floor doors from BILCO were installed at various water treatment stations in the town, which has more than 19,000 residents and sits on the border between the Long Island and Block Island Sounds.
|
Installation Instructions - Fire Rated Floor Doors
|
12/11/2020 12:52:00 PM
|
Installation and operation and maintenance instructions for BILCO Fire Rated Floor Doors.
|
Riyadh Metro System - Saudi Arabia
|
1/15/2021 12:58:00 PM
|
The metro system includes 73 floor access doors from BILCO to provide emergency egress from underground platforms at stations along the line. Doors of various sizes are used in the project, which is one of the largest orders in company history.
|
Virginia Department of Transportation
|
2/15/2021 3:28:00 PM
|
The corrosive nature of salt can adversely impact almost any building material. Architects sought a unique remedy for an access requirement in a hazardous material storage building owned by the Virginia Department of Transportation.
|
The Gordy Theater
|
5/11/2021 9:23:00 AM
|
The Gordy might not be the biggest theater in Houston, but in terms of appeal, intimacy and community impact, the newest addition to city’s entertainment scene is certainly just as important. Automatic smoke vents on this project feature STC 50 and OITC 46 sound ratings, the highest on the market.
|
Sarasota Lift Station
|
5/12/2021 1:44:00 PM
|
A new hurricane-resistant lift station in Sarasota, Fla., that opened in 2021 will help manage approximately 33 percent of the city’s wastewater flow. The project included the installation of 15 door doors from BILCO, the manufacturer of specialty access products.
|
Type E-HZ
|
10/11/2024 7:51:00 AM
|
Miami-Dade Approved. Submittal drawing in .pdf file format. Drawing includes fully dimensioned product plan and sectional views.
|
Type F-HZ
|
10/11/2024 7:51:00 AM
|
Miami-Dade Approved. Submittal drawing in .pdf file format. Drawing includes fully dimensioned product plan and sectional views.
|
Type L-HZ
|
10/11/2024 7:51:00 AM
|
Miami-Dade Approved. Submittal drawing in .pdf file format. Drawing includes fully dimensioned product plan and sectional views.
|
Type E-HZ
|
12/4/2023 2:47:00 PM
|
Miami Dade Approved. Sectional detail in .dxf CAD file format.
|
Type F-HZ
|
12/4/2023 2:47:00 PM
|
Miami Dade Approved. Sectional detail in .dxf CAD file format.
|
Type L-HZ
|
12/4/2023 2:48:00 PM
|
Miami Dade Approved. Sectional detail in .dxf CAD file format.
|
Type E-HZ
|
5/19/2021 10:48:00 AM
|
Miami-Dade Approved. 3-Part product specification in .doc format.
|
Type F-HZ
|
5/19/2021 10:49:00 AM
|
Miami-Dade Approved. 3-Part product specification in .doc format.
|
Type L-HZ
|
5/19/2021 10:49:00 AM
|
Miami-Dade Approved. 3-Part product specification in .doc format.
|
Arrowhead Ranch Water Reclamation Facility
|
6/3/2021 2:45:00 PM
|
The project at the Arrowhead Ranch Water Reclamation Facility started in 2014 with facility assessment. Construction began in 2017 and concluded in the spring of 2021 and includes a wide range of products from The BILCO Company.
|
Diemer Water Treatment Plant
|
7/9/2021 7:34:00 AM
|
In densely populated Orange County in California, nearly 3 million people per day rely on water from the Robert B. Diemer Treatment Plant. Treatment plant workers will access flocculation equipment through stainless steel doors manufactured by The BILCO Company.
|
PromoWest Pavilion at Ovation
|
7/19/2021 2:53:00 PM
|
The PromoWest Pavilion at Ovation is an indoor/ outdoor concert venue that will host nearly 180 events a year, bringing up to 400,000 music fans to the site. The project includes double-leaf smoke vents manufactured by BILCO to allow firefighters to bring a fire under control by removing smoke, heat and gasses from a burning building.
|
Odessa Groundwater Replacement Project
|
8/30/2021 3:26:00 PM
|
A new pumping station will provide water for up to 10,500 acres for users of the Odessa Aquifer. Maintenance teams will access the pumps through roof hatches manufactured by The BILCO Company. The custom hatches are fabricated with polycarbonate dome covers for natural daylight and engineered lift assistance for easy, one-hand operation.
|
Upper Arlington High School
|
11/19/2021 3:29:00 PM
|
Music and the performing arts play an important part in the educational experience at Upper Arlington High School in Ohio. A new building provides young performers one of the best environments in the nation to rehearse and improve their talents. The facility includes acoustical smoke vents from BILCO for life safety and to guard against noise intrusion.
|
East Side Access Project - New York, NY
|
2/28/2022 3:51:00 PM
|
The largest capital project in the history of Metropolitan Transportation Authority plans to become fully operational in December 2022. The project utilizes BILCO fire rated floor doors and will offer relief for long-suffering Long Island commuters.
|
Judy Reservoir Pumping Station
|
5/11/2022 10:28:00 AM
|
Judy Reservoir is the primary water source for residents of Skagit County in Washington State. When pumps eventually need replacement, they will be hoisted out of the facility through two motorized roof hatches manufactured by BILCO.
|
Reedy River Basin Sewer Tunnel
|
6/28/2022 2:56:00 PM
|
In the spring of 2022, Renewable Water Resources (ReWa) completed construction of a $46 million project that will serve the community’s wastewater conveyance needs for the next century. The BILCO Company manufactured 13 floor access doors of various sizes for the project.
|
Port of Alaska
|
8/24/2022 8:14:00 AM
|
In 2020, the port started a fve-stage modernization project that is expected to take a decade to complete. The total cost could reach $1.8 billion. One of the most innovative features of the trestle is the use of three custom-made roof hatches manufactured by BILCO. The hatches are 10-feet by 20-feet and allow access to fuel piping expansion joints.
|
Pensacola State College
|
9/8/2022 7:59:00 AM
|
Pensacola State College absorbed its share of damage during Hurricane Sally in 2020. Ashmore Auditorium was one of the buildings impacted by the hurricane as strong winds damaged the roof and the building experienced severe flooding. The most challenging aspect of roof replacement centered around the auditorium’s smoke vents. When contractors realized the opening required a custom product, BILCO’s outside sales representative, Waldo Brothers, worked with BILCO’s engineering team to develop a solution.
|
Palmer High School
|
10/10/2022 2:57:00 PM
|
The school sought solutions to replace existing automatic smoke vents, which did not meet fire codes and did not have functionality for testing. To install the new vents, workers removed nearly 4,000 pounds of cement from a cast-in-place structure on the roof. With assistance from a crane, saw cutter and intense labor, workers cut holes to match the size of the new BILCO acoustical smoke vents.
|
Type ACDSV-Quad Covers
|
12/4/2023 2:52:00 PM
|
Sectional Detail in .dxf CAD File Format
|
Type DSH - Quad Covers
|
12/4/2023 2:53:00 PM
|
Sectional Detail in .dxf CAD File Format
|
Type Lumivent - Quad Covers
|
12/4/2023 2:54:00 PM
|
Sectional Detail in .dxf CAD File Format
|
Type GD-50
|
12/4/2023 2:55:00 PM
|
Sectional Detail in .dxf CAD File Format
|
VersaMount-TB
|
12/4/2023 2:57:00 PM
|
Thermally Broken Design. Sectional Detail in .dxf CAD File Format.
|
Type ACDSV-Quad Covers
|
12/4/2023 3:36:00 PM
|
Submittal drawing in .pdf file format.
|
Type DSH-TB
|
12/4/2023 3:37:00 PM
|
Submittal drawing in .pdf file format.
|
Type Lumivent - Quad Covers
|
12/4/2023 3:50:00 PM
|
Submittal drawing in .pdf file format.
|
Type S-50SVTB
|
10/28/2024 10:12:00 AM
|
Thermally broken design. Submittal drawing in .pdf file format.
|
Type SS-50SVTB
|
10/28/2024 10:12:00 AM
|
Thermally Broken Design. Submittal drawing in .pdf file format. Drawing includes fully dimensioned product plan and sectional views.
|
VersaMount-TB
|
12/4/2023 4:16:00 PM
|
Thermally Broken Design. Submittal drawing in .pdf file format. Drawing includes fully dimensioned product plan and sectional views.
|
Captain James A. Lovell Federal Health Care Center
|
1/22/2024 1:51:00 PM
|
Many older buildings have vertically automatic installed smoke vents, which is the case at the Captain James A. Lovell Federal Health Care Center. The facility opened in 2010 but it is part of the North Chicago VA Medical Center that was built in 1926. Industria, the construction management on this renovation project, faced the difficult task of replacing fourteen vertical smoke vents and turned to BILCO for a custom solution.
|
University of Alaska Fairbanks
|
1/22/2024 1:52:00 PM
|
The University completed the frst phase of a multi-year renovation to implement code corrections that covered nearly 11,560 square feet at the 450-seat theater.The project included nine double leaf smoke vents manufactured by BILCO. The vents included two inches of polyisocyanurate insulation in the cover and curb to help reduce energy costs.
|
Cane Run Pump Station
|
1/22/2024 1:53:00 PM
|
The Clarksville-Jeffersonville Flood Control District built the Cane Run pump station, a $6 million project that replaces a station that had been operational for more than 70 years. The project includes three large BILCO roof hatches for access to the vertical turbine pumps.
|
Parker Water Reclamation Facility
|
1/22/2024 1:54:00 PM
|
As the community continued to expand, the challenge of keeping up with infrastructure improvements remained a concern. The most recent was the overhaul of the North Water Reclamation Facility which included ten roof hatches manufactured by BILCO. The roof hatches will provide workers with access to equipment for maintenance and replacement purposes.
|
Northglenn Lift Station
|
1/22/2024 1:55:00 PM
|
Northglenn needed a solution to access pipes regularly and push wastewater to its final destination at the community’s treatment facility. As a part of a major renovation project, the facility installed (14) floor doors from BILCO to provide safe access to pumps, process pipes and grinders for routine service and maintenance.
|
Ochsner Medical Center
|
1/22/2024 1:56:00 PM
|
The options for maneuvering a 21-ton, multi-million piece of life-saving medical equipment within a medical facility are quite limited. The team at Woodward Design+Build found its solution with a custom size roof hatch manufactured by BILCO.
|
Playhouse in the Park
|
1/22/2024 1:56:00 PM
|
The new theater incorporates acoustical smoke vents as one of its notable features, serving as a barrier against noise intrusion – an element that was previously unavailable when the Marx Theatre opened its doors more than 50 years ago.
|
Huntington Theatre
|
1/22/2024 1:57:00 PM
|
The project restores and revitalizes key architectural features of the historic building, highlighting the beauty of the original theater while providing modern comforts and amenities both in public areas and behind the scenes. The blending of old and new also marries new building technology, including a new thermally broken smoke vent from BILCO.
|
Residential Home - Scituate, MA
|
1/22/2024 1:58:00 PM
|
The 3,400 square foot home in Scituate, Mass. is located in a 4-unit development that is just one block from Cohasset Harbor. The home includes a roof top observation deck that provides breathtaking views of the ocean and is accessed by a BILCO thermally broken roof hatch.
|
Alki Pump Station
|
5/29/2024 11:57:00 AM
|
BILCO’S terrazzo doors proved valuable in a unique wastewater system refurbishment in Seattle. The primary task for Seattle Public Utilities centered on revamping the Alki Pump Station. The former station, built in 1959, was an airlift style facility that had reached the end of its useful life.
|
Roberto Clemente Academy
|
6/3/2024 3:34:00 PM
|
Workers from a Chicago mechanical team removed and installed two 750-ton air conditioning chillers. A 550-ton crane handled each of the chillers, which weigh about 12 tons apiece. Blackhawk HVAC completed the complex project by creating space in the roof for a Type D roof hatch from BILCO.
|
BIL-Guard - Non-BILCO Product
|
6/28/2024 1:13:00 PM
|
Submittal drawing for a BIL-Guard 2.0 roof hatch safety railing system on a non-BILCO product (.pdf format).
|
Gibson Creek Equalization Facility
|
7/17/2024 12:44:00 PM
|
Workers completed an $18.9 million project to supplement an existing pump station to help manage excessive flows in the existing sewer system. The project included 15 access doors manufactured by The BILCO Company. Various sizes were included in the project, including several H-20 doors that are reinforced for AASHTO H-20-wheel loading.
|
Type FT-30 Flood tight
|
8/20/2024 11:38:00 AM
|
Submittal drawing in .pdf file format. Drawing includes fully dimensioned product plan and sectional views.
|
Sacré-Coeur Retreat Center
|
8/21/2024 12:58:00 PM
|
With a reduction in the number of parishes and an evolving community, the diocese sought to rejuvenate its outreach through the development of the Sacré-Coeur Retreat Center. BILCO’s contribution to this project included two thermally broken roof hatches, safety railings and LadderUP® safety posts.
|
Type FT-30 - Flood tight
|
9/6/2024 1:14:00 PM
|
3-Part product specification in .doc format.
|
Type FT-30 - Flood tight
|
8/22/2024 10:10:00 AM
|
Sectional Detail in .dxf CAD File Format
|
Passaic Valley Sewerage Commission
|
9/17/2024 10:36:00 AM
|
A recent project at PVSC included replacing deteriorating grating on sewer meter chambers with floor access doors from The BILCO Company. The original aluminum and metal grating had been used for decades and required frequent removal and reinstallation by workers to access the chambers for cleaning.
|
St. Regis Longboat Key
|
10/11/2024 12:11:00 PM
|
St. Regis Longboat Key, developed on an 18-acre beachfront property in Sarasota, Fla., represents a remarkable blend of luxury and architectural innovation. BILCO’s terrazzo doors are central to the functionality of the St. Regis residences. These doors provide access to essential mechanical equipment for the private infnity-edge plunge pools integrated into 26 of the most exclusive homes.
|
Straughn School District
|
11/19/2024 10:26:00 AM
|
A new auditorium for the Straughn School District in Alabama will be an important piece of the community fabric. Work on the $8.2 million project in Andalusia, Ala. started in 2022 and was completed in February 2024. One of the unique aspects of the auditorium is a 23,000-square foot all-white roof. The roof includes four smoke vents manufactured by BILCO with a white powder coat finish.
|